How much does a block-paved driveway cost in Cheltenham?+
Every driveway is priced individually based on size, ground conditions, drainage, surface choice and access. We quote a fixed price after a free on-site survey — no guesswork, no day rates.
How long does a block driveway last?+
20–25+ years with correct sub-base specification and re-sanded joints every 2–3 years. The block itself is rated for 40+ years; failure is almost always groundworks-related.
Do I need planning permission for a new driveway?+
Not if it's under 5m² OR uses permeable construction OR drains to a permeable area. Standard impermeable driveways over 5m² do require planning. We design permeable by default - no application needed in 95% of cases.
Can you remove and dispose of my old driveway?+
Yes. Excavation, breakout and waste disposal are included in every quote. We hold a current Waste Carrier Licence and provide transfer notes on request.
What's the difference between concrete and clay block?+
Concrete is more affordable and offers wider colour range. Clay (fired at 1100°C+) holds colour permanently, doesn't fade in UV, and develops a richer patina with age - at roughly 20–30% premium.
Will weeds grow through?+
Not for the first 3–5 years if jointing sand is correctly installed. Long-term weed control comes from periodic re-sanding (every 2–3 years) - a 30-minute job per visit, which we offer as a maintenance call-back service.
Will it rut where I park?+
Not with a properly designed sub-base. Rutting is a groundworks failure, not a block failure. Every Millpond vehicle driveway uses 150–200mm MOT Type 1 in compacted 75mm layers - the spec that prevents it.
Can I include a soldier-course border or contrast banding?+
Yes. Most installs include a contrasting soldier-course border for visual edge definition. Banding, motifs, address numerals and contrast aprons at the gate are all standard options.
Do you handle dropped-kerb applications?+
Yes - we manage the Gloucestershire County Council application, footway crossing, and coordination with the highways contractor. Typically 6–10 week lead time, which we book into the programme.